Building in progress
Text introduction. Building in progress, neighbor is harvesting palm wine on our location, 1% alc, 100% natural. View front yard, high tide Casamance river, mangrove forest. Environment, palm grove and vegetable gardens district Diefaye. Front yard, genius bird nest constructions.
Casamance region, West African crossroad between Senegal, Gambia, Guinee-Bissau, Guinea and Mali. Between the palm forest and the Casamance river, 150 m from N6 National highway, 3 km town center. READ MORE
[01] Artist impression design main building by NL architects, facade with patterns of screen blocks, 2021. Image: NL Architects
[02] Artist impression design main building interior by NL architects, 2021.
Image: NL Architects
[03] Artist impression design main building interior by NL Architects, 2021.
Image: NL Architects
[04] Design graphic details facade, 3 types of custom breeze blocks in a rhythm, patterns for iron windows and the entrance door, 2022. Image: Casper Klaasse
[05a] Start of construction, leveling the site, 2021
Image: Casper Klaasse
[05] Delivery of the first amount of construction sand at our location, 2021.
Image: Casper Klaasse
[06] Team contractor Bibi Arial (SCI La Casamance) is putting the sizes off, 2021.
Image: Casper Klaasse
[07] Excavating the foundation by team SCI La Casamance, 2022.
Image: Casper Klaasse
[08] Thierno is supervising, 2022.
Image: Casper Klaasse
[09] Team SCI La Casamance finishing the foundation, 2022.
Image: Casper Klaasse
[10] Foundation of the main building completed, view on river side, 2022.
Image: Casper Klaasse
[11] Team Bibi Arial SCI La Casamance starts with the masonery, 2022.
Image: Casper Klaasse
[12] View on the river, 2022.
Image: Casper Klaasse
[13] View on the palm forest, 2022.
Image: Casper Klaasse
[14] Picnic on the construction site. With Marietou, Thierno, Thio, Sega, Santos and Felix, 2022.
Image: Casper Klaasse
[15] Ground floor, elevation, 2022.
Image: Casper Klaasse